We will make the installation and commissioning before making a delivery, however, how can you install and commission the machine? Please see as below:
1)Preparations before turning on the machine
2)Electrification adjustment
3)Installation of film adjustment of vertical seal
4)Length adjustment
5)Adjustment of photoelectric eye in color marks inspection
6)Adjustment of trace cam
7)Adjustment of eccentricity
8)Adjustment of trace System
9)Trial running with wrapping material loaded
10)Adjustment of the object to be packed on the conveyor
11)Adjust of hinge mechanism, such as horizontal sealer and single drive vertical sealer.
For more details, please check the manual book.